GUIDELINES ON ELECTIFICATION OF PRIMARY SCHOOLS

 RESPONSIBILITY OF RURAL ELECTRIFICATION AUTHORITY IN IMPLEMENTING THE PROJECT

 In implementation of the project's, R.E.A will undertake the following:

  • Construction of the power line connecting the school
  • Commissioning of the project jointly with Kenya Power
  • Provision of service cable and meter box
  • Issuance of an exemption letter to the school
  • The wiring of at least one classroom with provision of a main switch, 12 sockets and 2 – 4 flourescent lighting tubes.

 For off grid connections - Solar Photovoltaic Installations

  •  Provision of solar Photovoltaic Unit and accessories
  • Wiring of at least one classroom
  • Ensure the contractor issues the school with a wiring certificate

 

RESPONSIBILITY OF THE HEAD TEACHER IN ENSURING CONNECTION

  •  Apply to Kenya Power for metering
  • Payment of meter deposit to Kenya Power, attaching the following documents;

Attach;

  • Wiring certificate
  • School Registration Certificate
  • School Pin No. Certificate
  • Cash deposit slip of meter deposit
    • Offer security to the installed transformer

     

    FOR SOLAR INSTALLATION

    To carry out basic maintenance of the solar systems which include;

    • Check water levels of the batteries
    • Cleaning the Solar PV panels
    • Offer security to the solar installation, equipment and accessories

     